PROJECTS  /  BOILERS AND STEAM

16 TPH Thermax Shellmax boiler installation

CLIENT
Aspira Nigeria Limited
LOCATION
Kano, Kano State, Nigeria
YEAR
2025
SECTOR
Boilers and steam

OVERVIEW

Installation of a 16 tonnes-per-hour Thermax Shellmax boiler, with a 20 metre conical chimney, deaerator, steam header modification and the complete HSD and furnace oil piping system.

Discuss a similar project

SCOPE OF WORK

  • Fabrication and installation of conical chimney (top ID 900 mm × 20 m)
  • Fabrication and installation of flue gas duct (top ID 980 mm × 9 m)
  • Installation of 16 TPH boiler
  • Installation of deaerator
  • Modification of steam header
  • Piping fabrication and connection: boiler to steam header, safety valves, air vents, deaerator to feed water pump, steam header to PRV station and blowdown
  • HSD system piping: diesel tank to HSD header, header vent and drain, pump connections, spillover and burner supply and return
  • Furnace oil system piping: FO tank to ring main, ring main to digester, digester to degasser pump station, preheater to burner and return to FO tank
  • Insulation and cladding of deaerator, steam header and steam piping

ON SITE

Project photographs

More projects

All projects

Have a job that needs an engineer's opinion?

Send us the drawings, the scope or just the problem. We will come back with a method, a schedule and a price.