PROJECTS  /  BOILERS AND STEAM

25 TPH Thermax biomass boiler installation

CLIENT
Dufil Prima Food Limited
LOCATION
Port Harcourt, Rivers State, Nigeria
YEAR
Ongoing
SECTOR
Boilers and steam

OVERVIEW

Full erection and installation of a 25 tonnes-per-hour Thermax biomass boiler, from the furnace structure and pressure parts to the electrostatic precipitator, 33 metre chimney, ash handling and steam piping.

Discuss a similar project

SCOPE OF WORK

  • Erection and installation of boiler sloped grate and furnace structure
  • Erection of furnace MPA structure
  • Erection and installation of economiser support structure, economiser main assembly, and inlet and outlet duct
  • Erection of pressure parts, water wall assembly and site welding
  • Erection and installation of boiler pressure part main shell assembly
  • Erection of FD fan and PA fan
  • Fabrication and erection of air ducting
  • Erection and installation of feed water pumps
  • Erection of FD fan and PA fan ducting to boiler gate chamber
  • Fabrication and erection of platform and structure for main boiler, to Thermax drawings and supply
  • Assembly and installation of fuel handling system
  • Fabrication and erection of flue gas ducting from economiser to ESP
  • Fabrication and erection of ESP support structure
  • Fabrication and erection of ESP main casing assembly
  • Erection and welding of ESP hopper
  • Erection and installation of ESP internals
  • Erection and installation of ID fan
  • Erection and installation of 33 metre chimney with accessories
  • Fabrication and installation of flue gas ducting and support from ESP to chimney
  • Assembly and installation of ash handling system
  • Fabrication, assembly and erection of ash silo
  • Assembly and erection of dense phase ash system
  • Assembly and erection of steam header
  • Assembly and erection of deaerator and accessories
  • Erection of IBR piping
  • Erection of non-IBR piping
  • Erection of steam piping
  • Erection of compressed air piping
  • Refractory works
  • Assembly and erection of water softener plant
  • Fabrication and erection of blowdown and drain piping and blowdown vessel
  • Installation of boiler mountings and fittings to drawings
  • Fabrication and erection of cable tray supports and cable trays for power, control and signal
  • Manpower for insulation works to drawings
  • Commissioning and handover support