PROJECTS / BOILERS AND STEAM
OVERVIEW
Full erection and installation of a 25 tonnes-per-hour Thermax biomass boiler, from the furnace structure and pressure parts to the electrostatic precipitator, 33 metre chimney, ash handling and steam piping.
Discuss a similar projectSCOPE OF WORK
ON SITE
Send us the drawings, the scope or just the problem. We will come back with a method, a schedule and a price.