PROJECTS  /  BOILERS AND STEAM

Two 14 TPH and one 8 TPH Forbes Marshall boiler installation

CLIENT
African Textile Management System
LOCATION
Cotonou, Benin Republic
YEAR
2025
SECTOR
Boilers and steam

OVERVIEW

Installation of three Forbes Marshall boilers for a textile plant in Benin Republic, including gas trains, chimney, 40 metre flue gas ducting, steam header, full boiler house piping and insulation.

Discuss a similar project

SCOPE OF WORK

  • Erection of gas train with piping and gas train components
  • Erection of chimney
  • Erection of Ø685 mm × 40 m round flue gas ducting
  • Erection of 20 KL feed water tank with valves and fittings
  • Erection of 2.5 KL diesel day oil tank with valves and fittings
  • Erection of compressed air piping from boiler house point to boiler feed water control valves
  • Fabrication and erection of steam header (300NB × 2 m)
  • Fabrication and erection of HP steam, feed water, fuel and oil, blowdown, safety valve exhaust, drain, air vent and instrument air piping, instrument air SS tubing and fittings, and chemical dosing piping
  • Fabrication and erection of support structures for all steam, water, fuel, blowdown, drain, vent and instrument air piping
  • Insulation and cladding of flue gas ducting, feed water tank and all hot piping, steam header included