PROJECTS  /  BOILERS AND STEAM

10.5 TPH waste heat recovery boiler and balance of plant

CLIENT
Green Hills Agric Products Limited
LOCATION
Benin City, Edo State, Nigeria
YEAR
2025
SECTOR
Boilers and steam

OVERVIEW

Fabrication and erection of the balance of plant for a 10.5 tonnes-per-hour waste heat recovery boiler, including a 30 metre chimney, flue gas ducting, blowdown tank, access platforms, insulation and the complete piping system.

Discuss a similar project

SCOPE OF WORK

  • Fabrication, supply and erection of chimney (Ø1100 mm × 30 m) with supports and accessories
  • Fabrication and installation of Ø1000 mm flue gas ducting with supports and stiffeners
  • Fabrication and erection of 1 KL blowdown tank
  • Fabrication and erection of mounting structures for the deaerator tank
  • Fabrication and installation of access platforms for the economiser header, with handrails and ladders
  • Supply and installation of insulation and aluminium or GI cladding for blowdown tank, economiser, deaerator storage tank and deaerator head
  • Fabrication, erection, testing and commissioning of feed water, blowdown, safety valve exhaust, drain, spill back, air vent, instrument drain and overflow lines, steam header and steam pipeline
  • Fabrication, erection and painting of structural supports for chimney, ducting, tanks and pipelines
  • Surface preparation, primer and finish painting of all fabricated steel

ON SITE

Project photographs

More projects

All projects

Have a job that needs an engineer's opinion?

Send us the drawings, the scope or just the problem. We will come back with a method, a schedule and a price.